中文 / EN

11 hot news about offshore wind power (2021.10.23-10.29)

2021/10/29 Source:ChinaOffshoreWind

1. The State Council issued a document! Comprehensively promote large-scale development of scenery and base construction

On October 26, the Chinese government website officially released the "Notice of the State Council on Printing and Distributing the Carbon Peak Action Plan by 2030" (Guo Fa [2021] No. 23).

It is proposed to vigorously develop new energy. Comprehensively promote the large-scale development and high-quality development of wind power and solar power, adhere to the simultaneous development of centralized and distributed, and accelerate the construction of wind power and photovoltaic power generation bases. Adhere to both land and sea, promote the coordinated and rapid development of wind power, improve the offshore wind power industry chain, and encourage the construction of offshore wind power bases. By 2030, the total installed capacity of wind power and solar power will reach 1.2 billion kilowatts or more

Source: China Government Network


2. National Energy Administration: 16.43 million kilowatts will be added from January to September! Wind power will break the 300 million mark

On October 21, the National Energy Administration released national power industry statistics from January to September. As of the end of September, the national installed capacity of power generation was 2.29 billion kilowatts, a year-on-year increase of 9.4%. Among them, the installed capacity of wind power was approximately 300 million kilowatts, a year-on-year increase of 32.8%. The installed capacity of solar power generation is approximately 280 million kilowatts, a year-on-year increase of 24.6%.

Source: National Energy Administration


3. Yangjiang, Guangdong plans to build the country’s first wind power city, and strive to build a world-class offshore wind power industry chain ecosystem base

Nanfang Daily learned from the relevant departments of Yangjiang that on October 21, the "Guangdong (Yangjiang) International Wind Power City Planning" passed the expert panel review. According to the plan, Guangdong (Yangjiang) International Wind Power City will speed up the construction of the entire wind power industry chain ecology, and coordinate the optimization of industry and urban space linkage and the deep integration of industry and city, and build a world-class offshore wind power "based in Guangdong, radiating across the country, and going to the world" The ecological system base of the whole industry chain promotes Yangjiang's wind power industry to the mid-to-high-end level of the global industry chain.

It is understood that Guangdong (Yangjiang) International Wind Power City is the first wind power city planned and constructed in China. It will become an important platform to promote the further optimization of the province's energy production and consumption structure and help the province achieve the goal of carbon peak and carbon neutrality.

Source: Nanfang Daily


4. The country's first affordable offshore wind power project-the main offshore project of CGN Shanwei Jiazi No. 1 project started

On October 1, the No. 20 wind turbine foundation of CGN's Shanwei Jiazi 1.5 million kilowatt offshore wind power project began piling operations. This is the country's first affordable offshore wind power project to achieve the start of the main offshore project, which has opened up affordable offshore wind power in Guangdong Province and even the country. The prelude to the construction of the project.

The Shanwei Jiazi No. 1 Offshore Wind Power Project is located in the sea area south of Hudong Town, Shanwei City, Guangdong Province. The closest distance to land is about 25km, the water depth is 30-35m, and the planned installed capacity is 500,000 kilowatts. It is planned to install 78 sets of 6.45MW wind turbines and one supporting building. The 220kV sea booster station is also supporting the construction of the land booster station (centralized control center) shared by the CGN Houhu, Jiazi 1 and Jiazi 2 projects. The power generated by this project will be connected to the 500-kV Maohu Station after the on-land booster station is boosted to 500kV. It is the first offshore wind power project in China to be approved to use the 500kV voltage level.

The CGN Shanwei Jiazi No. 1 Offshore Wind Power Project will strive to become a demonstration project of affordable offshore wind power in Guangdong Province and even the whole country, and set an industry benchmark for the construction of affordable offshore wind power projects in China.

Source: China General Nuclear Power New Energy


5. The first domestic 30-meter professional wind power operation and maintenance ship "China Sea Equipment 001" was officially launched!

On October 22, 2021, China Shipbuilding Group Haizhuang Wind Power Co., Ltd. (hereinafter referred to as "China Haizhuang) and Yinghui Southern Shipbuilding Co., Ltd. jointly designed and manufactured the first domestic 30-meter-class double-hull all-aluminum professional ship The wind power operation and maintenance ship "China Sea Equipment 001" was officially launched.

"China Haizhuang 001" signed a construction contract on November 10, 2020, and officially started construction on February 23, 2021, and will be delivered and put into operation at the end of 2021. The ship has a total length of 30.05 meters, a total width of 9.9 meters, a depth of 3.2 meters, a draft of 1.7 meters, a design speed of 25 knots, a maximum load of 38 tons, a wave resistance of 4 meters, and a capacity of 12 operation and maintenance personnel and 6 crew members. Excellent safety, rapidity, anti-corrosion, seakeeping, comfort and accessibility, can realize efficient operation and maintenance in different sea areas such as Shandong, Jiangsu, Zhejiang, Fujian.

Source: China Haizhuang


6. CNOOC's first offshore wind power project with full capacity connected to the grid for power generation

On October 19th, CNOOC’s first offshore wind power project, Jiangsu Offshore Wind Farm, was put into operation at full capacity, marking the further implementation of CNOOC’s green and low-carbon strategy in the Yangtze River Delta region and guaranteeing local power supply for this winter and next spring. Has important social significance.

The offshore wind farm center of the Jiangsu Wind Power Project is 39 kilometers away from the shore, with a planned total installed capacity of 300,000 kilowatts, including 67 wind turbines, one 220kV sea booster station, one onshore centralized control center, and two circuits of 220 thousand kilowatts. Volt cable.

"After the project's full capacity is connected to the grid, the annual on-grid power can reach 860 million kilowatt-hours. Compared with the thermal power generation device of the same installed capacity, it can save 279,000 tons of standard coal and reduce 571,000 tons of carbon dioxide each year, which is equivalent to planting approximately The total amount of carbon dioxide that can be absorbed by 430,000 acres of woods will make new contributions to the construction of a green and beautiful Yangtze River Delta."

Source: The Paper


7. Ship "Xin Zhenfu 7" successfully completed the hoisting of the sea ascending pressure station

Recently, the upper module of the sea uplift station of the Dalian Zhuanghehai IV-1 project has been successfully installed.

The project is located near the sea area of Zhuanghe, Dalian City, Liaoning Province. It includes 8 wind farms with a total installed capacity of 1.9 million kilowatts. Among them, the Dalian Zhuanghe IV-1 wind farm project has an installed capacity of 350 MW, and is equipped with a 220 kV sea booster station, weighing about 3,370 tons. It is currently the sea booster station with the largest unit capacity and the farthest distance from the shore in northern China. .

Source: Zhenhua Heavy Industry


8. Heavy! Domestic offshore wind power adds a new weapon

On October 25, 2021, the "Runneng 168" cable laying vessel invested and operated by Green International Holdings Co., Ltd. (Green Holdings) held an on-site delivery ceremony at CIMC Raffles Yantai, Shandong.

"Runneng 168" is the first 15,000 gross tonnage cable-laying ship in unlimited navigation area in China. It was designed by Nanjing Puning Ship Design Co., Ltd., and Yantai CIMC Raffles Offshore Engineering Co., Ltd. was responsible for the upgrade. The ship has a length of 114.3 meters, a depth of 6.1 meters, a full-load draft of 3.95 meters, a full-load displacement of 14,820 tons, and a loading capacity of 10,000 tons. It is equipped with a cable carousel with a diameter of 32 meters and a loading capacity of 8,000 tons, DP2 automatic control system, and 4 full-scale bows and sterns. Rotary rudder propeller, 1 set of 50 tons-35 meters and 1 set of 30 tons-26 meters Keling crane, 8 sets of 50 tons positioning winches, 1 set of 60 tons hydraulic gantry crane, plus buried plows, etc. (embedded depth 0 to 4 meters, 0 to 20 meters per minute). The ship's self-sustaining power is about 1500 hours, and the maximum capacity is 60 people, which can meet the requirements of 220KV submarine cable laying. The ship is at the leading domestic level in terms of program design, modification technology, and functional configuration. It is the most powerful and highest gross tonnage cable-laying ship in China.

Source: Green International Holdings Limited


9. In 2021, the largest global offshore wind power acquisition is born!

Recently, Danish energy giant Wosch sold half of its 100% stake in the German 900MW Borkum Riffgrund 3 offshore wind farm (project company), or 50%, to the fund company Glennmont Partners. This is the global offshore wind power M&A market this year. The largest transaction.

The total value of this transaction is 9 billion Danish kroner, which is equivalent to nearly 9 billion yuan (US$1.4 billion), including 50% of the equity value and half of the financing of the EPC contract. Woxu is responsible for the construction of the entire wind farm, 20 years of operation and maintenance, and the green electricity trading for the wind farm.

Source: European offshore wind power


10. The Swedish developer 11GW offshore wind power makes its first shot!

Recently, OX2, a renewable energy developer from Northern Europe, has applied for the EU “Natura 2000” environmental permit for the 1.7GW Galatea-Galene offshore wind power project in southern Sweden. This is OX2's first licensed offshore wind power project.

The Galatea-Galene project consists of two areas outside Halland province, approximately 25 kilometers from Falkenberg and Varberg south of Gothenburg.

The wind farm is expected to install 68 to 101 wind turbines, which will generate 6 to 7 billion kilowatt-hours of electricity each year, which is equivalent to the annual electricity consumption of about 1.2 million Swedish households.

Source: European offshore wind power


11. Yongfu shares and Dutch SPT company held a strategic cooperation signing ceremony in Fuzhou

On October 28th, Lin Yiwen, Chairman and General Manager of Yongfu Co., Ltd., Mark Riemers, General Manager of Dutch SPT Offshore BV, Michiel Bierkens, Consul General of the Kingdom of the Netherlands in Guangzhou, Zhou Shiju, Party Member and Deputy Director of Fujian Science and Technology Department, Fuzhou, Fuzhou Witnessed by Wei Bangzhong, secretary of the Party Working Committee of the High-tech Zone, and other leaders and guests from the government and owner units, they jointly "signed the cloud" strategic cooperation agreement.

According to the agreement, the two parties will give full play to their respective advantages and formally raise the cooperation from the project level to the all-round cooperation in the market, technology and engineering, and provide more high-quality technical solutions for China's offshore wind power to achieve parity on the grid and the development of far-reaching offshore wind power, and to open up a joint Win a new chapter!

Yongfu Co., Ltd. & SPT surveyed, designed and installed Shenguan's Changle Offshore AC Area Offshore Wind Power Project, which has created the world's five highest in the world so far with the largest single unit capacity, the largest number, the deepest water depth, the highest foundation height, and the fastest speed.

Source: Fujian Yongfu Electric Power Design Co., Ltd.